Pilot partners
Put your parts on the first cell.
We are looking for a small number of makers of cold plates, quick disconnects, CDUs and manifolds to build the first robot test cell around. It is early: the first cell is in build, and pilot partners shape what it does.
01 / What a partner gets
A test plan written for your part
Agents draft it from your specification and the standard you are working to. You see it and approve it before anything runs.
Your parts on the first cell
As the cell comes up, your parts are among the first it runs: pressure, leak and flow tests, and connect and disconnect cycling on quick couplings.
The data, all of it
Raw measurements for every run and a report laid out against the standard, reviewed by an engineer.
A say in what gets built
Pilot partners decide what the cell learns first. If your bottleneck is a different test, we want to hear it.
02 / What we need from you
Sample parts and drawings
A few samples of one part number, with ports, fittings, rated pressure and flow.
How you test today
Your current method, who does it, how long it takes and where it goes wrong.
Volumes and timing
Roughly how many parts a month, and when a faster test would matter to you.
An engineer to talk to
About half an hour every couple of weeks, and straight feedback.
The honest small print
- The first cell is in build. We will agree timing with you before you ship anything.
- Today the agent pipeline runs on simulated rigs. The robot and the rigs are what the pilot is for.
- Loopwerks is not a certification body and holds no ISO/IEC 17025 accreditation. A report states the methods followed. It is not a certificate.
- Terms are agreed in writing before any work starts.
03 / Apply
Tell us about your part.
We reply within two working days to book a short call. What you send is used only to reply to you. See the privacy note.